Post by Chuck »

I created a todo list of things that has to be done before alpha testing started. There were six items on the list. Two are completely done. One is testing after the six items are done. Which leaves us three items. If everything goes well those will be done by the end of next week, probably sooner actually. So all is going very well actually.

OT: Ok, I'm a horror movie fan. My wife hates them so I have to sneak them in while I can. I decided to see Saw V today. What a load of crap. About half of the movie was flashbacks from the other movies :p Don't pay money to see this one.

Back to coding.